Customise Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorised as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyse the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customised advertisements based on the pages you visited previously and to analyse the effectiveness of the ad campaigns.

No cookies to display.

  1. Home
  2. »
  3. News
  4. »
  5. SEE THE PROGRESS

Take a peek at a job currently in progress by the BG Construction team, including:

    • Creating four additional bedrooms each with underfloor heating.
    • Installing a state of the art bespoke staircase.
    • Fitting an amazing 100 sq.ft open plan kitchen diner, with 7m  x 2m latin light.
    • Levelling out and building an expansive 200 sq.m terrace.
    • Installing new plumbing and electrical wiring.
    • Adding a Hamilton lighting system – a comprehensive, intelligent, easy-to-use dimming and control solution. The lighting system controls day-to-day lighting scenarios; from simple dimming to scene-setting programmes which can be set, stored and recalled with ease.
    • A mansard flat roof disguised behind traditional clay tiles.
7th June 2016

The image below shows the progress as of 7th June 2016.  The ground work and extension are taking good shape.

12th July 2016

Work has progressed, installing dormer to create new rooms in the loft space.

1st August 2016

Showing the new wall and raised patio area.

1st August 2016

Felt and batton have been applied and the new tiles are loaded and tiling has begun.

1st August 2016 - Roof

1st August 2016 - Roof

1st August 2016 - Loft Space

The carpenters have been busy creating timber stud work to form walls to new rooms in the loft space.

1st August 2016 - First Floor

Creation of blockwork, opening for new staircase leading into the loft and timber stud partitions including engineered structural steel support work for loft space.

1st August 2016 - First Floor

Consideration have also been made for providing recessed storage in bathroom walls.

1st August 2016 - First Floor

1st August 2016 - Ground Floor

The original wall was removed to form a new open plan kitchen area.  The beam was an exceptional length and weight – it required a block and tackle system to raise it into position.

1st August 2016 - Ground Floor

New structural beam to support existing external wall.